<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    <b><br>
      YarraBUG March 2015 News update - including Remembrance Ride for
      Alberto Paulon tomorrow at 5.30pm + latest 3CR podcasts<br>
      <br>
    </b><b>1. Safer Cycling Sydney Road: Remembrance Ride for Alberto
      Paulon</b><b> - Friday 6th March</b><br>
    <b>2. 2015 As Bare As You Dare</b><b> - Sunday 8th March</b><br>
    <b>3. From City of Yarra: Collins (Gipps Street) Bridge Works -
      Commencing 3 March 2015</b><br>
    <b>4. </b><b>Wellington St Copenhagen Bike Lane Construction to
      Start 16 March 2015</b><br>
    <b><b>5. Latest YarraBUG Radio podcasts on 3CR<br>
        <br>
        <br>
      </b></b>Do you have a inner Melbourne bike-related event coming
    up? Or you know of upcoming road or shared path works around Yarra?
    <br>
    Please let us know (<a class="moz-txt-link-abbreviated" href="mailto:events@yarrabug.org">events@yarrabug.org</a>) & we’ll add them to
    this public calendar to get the word out.<br>
    <a class="moz-txt-link-freetext" href="http://www.yarrabug.org/events/">http://www.yarrabug.org/events/</a><b><br>
    </b><b><br>
      <br>
      1. Safer Cycling Sydney Road: Remembrance Ride for Alberto Paulon</b><b>
      - Friday 6th March</b><br>
    Meet 5.30pm, southern end of Sydney Road near playing fields &
    Park Street.<br>
    Come and join us to raise awareness and help make Sydney Road a safe
    place for people cycling. <br>
    We are going to ride up Sydney Road to Moreland Road as a quiet
    memorial.<br>
    #AlbisRide on twitter, facebook & instagram<br>
    More at: <a class="moz-txt-link-freetext" href="http://www.safercyclingsydneyroad.com/">http://www.safercyclingsydneyroad.com/</a><br>
    <br>
    <br>
    <b>2. 2015 As Bare As You Dare</b><b> - Sunday 8th March</b><br>
    Starting at the Fox Hotel where we can all get a bit of ‘Dutch
    courage’ before sneaking off to our super secret paint-up and
    undress location.<br>
    PLEASE NOTE – Start/End are NOT the same spot and you will have to
    carry your clothes (or send via 1 vehicle we will have; Bags will be
    provided if required. TBC)<br>
    This ride is an easy 9km and takes in annual favs of Brunswick and
    Johnston and across to Lygon St.<br>
    <br>
    -LATE UPDATE-<br>
    In honor of Alberto Paulon, a bicycle rider who lost his life after
    an alleged car dooring, WNBR will also take back Sydney Rd Brunswick
    to remind everyone, everywhere that roads are for sharing.<br>
    Please use the #AlbisRide on Twitter, Facebook etc for any comment
    or pictures in this area. The memorial will be a sombre moment and
    riders (whilst naked) will be requested to respect the location and
    recent event. A moments silence will be observed and the ride will
    continue on. Remember this could be any bike rider and a key point
    of why the World Naked Bike Ride happens across the world. Ride will
    wind-up with exploring Royal Park and great views back to the CBD.<br>
    More at: <a class="moz-txt-link-freetext" href="http://www.asbareasyoudare.com/?page_id=999">http://www.asbareasyoudare.com/?page_id=999</a><br>
    <br>
    <br>
    <b>3. From City of Yarra: Collins (Gipps Street) Bridge Works -
      Commencing 3 March 2015</b><br>
    This is to advise of upcoming works on Collins footbridge. The
    bridge is located at the eastern end of Gipps Street, Abbotsford and
    connects City of Yarra with Yarra Bend Park, Kew.<br>
    The works on the bridge will commence on the 3 March 2015 and it is
    anticipated to take 8 – 10 weeks to complete. The works will
    include:<br>
    <br>
    · Steel re-enforcement of the main span structure and of the eastern
    approach;<br>
    · Application of an anti-rust treatment at elements of the main span
    and approaches;<br>
    · Rehabilitation of all 4 supporting pylons;<br>
    · Limited deck remedial work and associated works.<br>
    <br>
    The footbridge will be closed to all traffic during normal working
    hours – from 7:00am till 5:00pm. There will be full access through
    this bridge outside of the working hours.<br>
    There will be 12 information signs installed in strategic locations
    – around 2 weeks prior to the works commencement. The signs will
    inform of the works, will provide contact details and will indicate
    possible detours during working hours.<br>
    There will be two relatively small compounds established at both –
    Yarra and Parks Victoria end of the bridge – for storage of
    equipment, materials and other needs. Both compounds will be removed
    on completion of works and pre-existing conditions will be
    re-established.<br>
    Regards, Leonid Volkov, Project Engineer City of Yarra PO Box 168
    Richmond 3121<br>
    T (03) 9205 5750 F (03) 8417 6666 Mob: 0412 205 575<br>
    <br>
    <br>
    <b>4. </b><b>Wellington St Copenhagen Bike Lane Construction to
      Start 16 March 2015</b><br>
    From Alistair McDonald at CoY:  Citywide Services will start
    construction on the Wellington Street separated Copenhagen bicycle
    lanes on behalf of Yarra City Council on Monday 16 March 2015.  The
    project will deliver separated bicycle lanes (often referred to as
    Copenhagen lanes) between Gipps Street and Victoria Parade, and will
    improve safety for cyclists by completely separating bicycles from
    road traffic along this section of Wellington Street.  Additional
    information can be found at the Yarra City Council Website with
    information about the construction schedule and works methods to be
    sent out in the coming month. <br>
    More at:
<a class="moz-txt-link-freetext" href="http://www.yarracity.vic.gov.au/Parking-roads-and-transport/Current-projects/wellington-street-copenhagen-bicycle-lanes/">http://www.yarracity.vic.gov.au/Parking-roads-and-transport/Current-projects/wellington-street-copenhagen-bicycle-lanes/</a><br>
    <br>
    <br>
    <b>5. Latest YarraBUG Radio podcasts on 3CR<br>
      <br>
      YarraBUG Radio Show #327 Monday 2nd March 2015<br>
    </b>On this weeks program Chris talks to long time cycling
    campaigner and fellow radio producer Chris Virtue about riding and
    transport issues in Sydney & Melbourne. Local news includes the
    2015 ‎As Bare As You Dare Ride and Safer Cycling Sydney Road‬ ride +
    petition organised by Brunswick residents in the wake of Alberto
    Paulon’s tragic dooring death on Friday 27 February 2015.<b><br>
    </b><a class="moz-txt-link-freetext" href="http://www.yarrabug.org/radio/?p=1881">http://www.yarrabug.org/radio/?p=1881</a><b><br>
      <br>
      YarraBUG Radio Show #326 Monday 23rd February 2015<br>
    </b>Val and Faith welcome studio guests, Anna Thompson and Caz
    Whitehead and everyone shares a bike moment. We run through some
    news including shared-path racing on Strava and Anna Meares’ 11th
    World Title in Paris. Caz and Anna fill us in on #Everesting and the
    recent mass women’s everesting on Mt Donna Buang, which they were
    both a part of. We finish up with a coupe of events. #girlsgetrad
    #insearchofup<br>
    <a class="moz-txt-link-freetext" href="http://www.yarrabug.org/radio/?p=1878">http://www.yarrabug.org/radio/?p=1878</a><b><br>
      <br>
      YarraBUG Radio Show #325 Monday 16th February 2015<br>
    </b>This week Chris speaks to David Borella from BikeSydney about
    campaigning & some of the strange, retrogressive things that
    seem to be happening in NSW with the threat of cycleways and train
    lines being removed for “progress” News includes Melbourne’s second
    BikeRave, Wellington Street Copenhagen lanes community session,
    Yarra Council Budget and quick mention about the Evandale Penny
    Farthing championships.<b><br>
    </b><a class="moz-txt-link-freetext" href="http://www.yarrabug.org/radio/?p=1873">http://www.yarrabug.org/radio/?p=1873</a><b><br>
      <br>
      YarraBUG Radio Show #324 Monday 9th February 2015<br>
    </b>Val and I took a break from the Yarra BUG Radio Show over the
    summer and this was our first day back in the studio, you might hear
    a couple of glitches! We eased into the show with some news, the
    Herald Sun Tour and of course the mass Everlasting on the previous
    weekend. Our studio guests for this show were Mark Drehlich of
    Cycling Victoria and Jacinta Costello of Ladies Back on Your Bike.
    They came in to talk about the The Women’s Ride, an initiative of
    Cycling Victoria together with The Squeaky Wheel, Vic Health and the
    Amy Gillett Foundation. While organised by Cycling Victoria it
    relies on grassroots initiatives to get women onto their bikes, all
    on the one day, April 12th.<b><br>
    </b><a class="moz-txt-link-freetext" href="http://www.yarrabug.org/radio/?p=1863">http://www.yarrabug.org/radio/?p=1863</a><br>
    <br>
    <br>
    <pre class="moz-signature" cols="72">-- 
Listen to YarraBUG Radio
Every Monday morning 10am on 3CR 855AM Community Radio + Digital
<a class="moz-txt-link-freetext" href="http://www.yarrabug.org/radio/">http://www.yarrabug.org/radio/</a>
------------ --------- --------- --------- ---------
Abbotsford, Alphington, Burnley, Carlton North,
Clifton Hill, Cremorne, Collingwood, Fairfield,
Fitzroy, Fitzroy North, Princes Hill, Richmond
------------ --------- --------- --------- --------- </pre>
  </body>
</html>